Network-Constrained Unit Commitment with Flexible Temporal Resolution
Modern network-constrained unit commitment (NCUC) bears a heavy computational burden due to the ever-growing model scale. This situation becomes more challenging when detailed operational characteristics, complicated constraints, and multiple objectives are considered. We propose a novel simplification method to determine the flexible temporal resolution for acceleration and near-optimal solutions. The flexible temporal resolution is determined by analyzing the impact on generators in each adaptive time period with awareness of congestion effects. Additionally, multiple improvements are employed on the existing NCUC model compatible with flexible temporal resolution to reduce the number of integer variables while preserving the original features. A case study using the IEEE 118-bus and the Polish 2736-bus systems verifies that the proposed method achieves substantial acceleration with low cost variation and high accuracy.
Code (0)
등록된 구현이 없습니다.
Similar Papers 제목 키워드 기반
Unit Commitment with Cost-Oriented Temporal Resolution
Time-adaptive unit commitment (UC) has recently been investigated to reduce the scheduling costs by flexibly varying the temporal resolution, which is usually determined by clustering the net load patterns. However, ther…
Bilevel OptimizationClusteringSchedulingStructure-Aware Commitment Reduction for Network-Constrained Unit Commitment with Solver-Preserving Guarantees
The growing number of individual generating units, hybrid resources, and security constraints has significantly increased the computational burden of network-constrained unit commitment (UC), where most solution time is …
Dimensionality ReductionSpatio-Temporal Deep Learning-Assisted Reduced Security-Constrained Unit Commitment
Security-constrained unit commitment (SCUC) is a computationally complex process utilized in power system day-ahead scheduling and market clearing. SCUC is run daily and requires state-of-the-art algorithms to speed up t…
Deep LearningSchedulingTemporal SequencesAn Alternative Method for Solving Security-Constrained Unit Commitment with Neural Network Based Battery Degradation Model
Battery energy storage system (BESS) can effectively mitigate the uncertainty of variable renewable generation and provide flexible ancillary services. However, degradation is a key concern for rechargeable batteries suc…
SchedulingData-Driven Continuous-Time Framework for Frequency-Constrained Unit Commitment
The conventional approach to solving the unit commitment problem involves discrete intervals at an hourly scale, particularly when integrating frequency dynamics to formulate a frequency-constrained unit commitment. To o…