Secure Expansion of Energy Storage and Transmission Lines Considering Bundling Option Under Renewable Penetration
This paper presents a multi-stage expansion model for the co-planning of transmission lines, battery energy storage (ES), and wind power plants (WPP). High penetration of renewable energy sources (RES) is integrated into the proposed model concerning renewable portfolio standard (RPS) policy goals. The possibility of bundling existing transmission lines to uprate power flow capacity is considered. Renewable energy curtailment and load shedding are included in the model to assess the system operation more precisely. Battery ES devices are co-planned to defer transmission expansion and renewable management. To make the time complexity of the problem tractable and capture the uncertainties of load and RES in an hourly resolution, a chronological time-period clustering algorithm is used to extract the representative hours of each planning stage. Additionally, the flexible ramp reserve is utilized to handle the uncertainty of RES. An accelerated Benders dual decomposition (BDD) algorithm is developed to solve the proposed model mixed-integer linear programming (MILP) formulation. The N-1 security criterion is evaluated by considering a designed contingency screening (CS) algorithm to identify higher risk contingencies. The effectiveness of the proposed co-planning model is evaluated using IEEE RTS 24-bus and IEEE 118-bus test systems.
Code (0)
등록된 구현이 없습니다.
Similar Papers 제목 키워드 기반
Integrated Expansion Planning of Electric Energy Generation, Transmission, and Storage for Handling High Shares of Wind and Solar Power Generation
In this paper, an integrated multi-period model for long term expansion planning of electric energy transmission grid, power generation technologies, and energy storage devices is introduced. The proposed method gives th…
Assessing the Reliability Benefits of Energy Storage as a Transmission Asset
Utilizing energy storage solutions to reduce the need for traditional transmission investments has been recognized by system planners and supported by federal policies in recent years. This work demonstrates the need for…
High-Spatial Resolution Transmission and Storage Expansion Planning for High Renewable Grids: A Case Study
Transmission Expansion Planning (TEP) is the process of optimizing the development and upgrade of the power grid to ensure reliable, efficient, and cost-effective electricity delivery while addressing grid constraints. T…
Reducing transmission expansion by co-optimizing sizing of wind, solar, storage and grid connection capacity
Expanding transmission capacity is likely a bottleneck that will restrict variable renewable energy (VRE) deployment required to achieve ambitious emission reduction goals. Grid interconnection and inter-regional transmi…
Capturing Chronology and Extreme Values of Representative Days for Planning of Transmission Lines and Long-Term Energy Storage Systems
The growing penetration of renewable energy sources (RESs) is inevitable to reach net zero emissions. In this regard, optimal planning and operation of power systems are becoming more critical due to the need for modelin…
Time Series