Data-driven project planning: An integrated network learning and constraint relaxation approach in favor of scheduling
Our focus is on projects, i.e., business processes, which are emerging as the economic drivers of our times. Differently from day-to-day operational processes that do not require detailed planning, a project requires planning and resource-constrained scheduling for coordinating resources across sub- or related projects and organizations. A planner in charge of project planning has to select a set of activities to perform, determine their precedence constraints, and schedule them according to temporal project constraints. We suggest a data-driven project planning approach for classes of projects such as infrastructure building and information systems development projects. A project network is first learned from historical records. The discovered network relaxes temporal constraints embedded in individual projects, thus uncovering where planning and scheduling flexibility can be exploited for greater benefit. Then, the network, which contains multiple project plan variations, from which one has to be selected, is enriched by identifying decision rules and frequent paths. The planner can rely on the project network for: 1) decoding a project variation such that it forms a new project plan, and 2) applying resource-constrained project scheduling procedures to determine the project's schedule and resource allocation. Using two real-world project datasets, we show that the suggested approach may provide the planner with significant flexibility (up to a 26% reduction of the critical path of a real project) to adjust the project plan and schedule. We believe that the proposed approach can play an important part in supporting decision making towards automated data-driven project planning.
Code (0)
등록된 구현이 없습니다.
Tasks
Decision MakingSchedulingMethods 이 논문이 사용한 방법론
Similar Papers 제목 키워드 기반
Resource-constrained multi-project scheduling with activity and time flexibility
Project scheduling in manufacturing environments often requires flexibility in terms of the selection and the exact length of alternative production activities. Moreover, the simultaneous scheduling of multiple lots is m…
SchedulingPartitioning Distribution Networks for Integrated Electrification Planning
In many developing countries, access to electricity remains a significant challenge. Electrification planners in these countries often have to make important decisions on the mode of electrification and the planning of e…
ClusteringDiffSlack: Learning under Nonlinear Inequality Constraints via Learnable Slack Variables
Enforcing nonlinear inequality constraints in neural networks remains challenging, especially when the output is subject to many coupled constraints. Existing hard constraint methods often impose structural restrictions …
Collision AvoidanceCompositional Diffusion-Based Continuous Constraint Solvers
This paper introduces an approach for learning to solve continuous constraint satisfaction problems (CCSP) in robotic reasoning and planning. Previous methods primarily rely on hand-engineering or learning generators for…
Optimal Integrated Task and Path Planning and Its Application to Multi-Robot Pickup and Delivery
We propose a generic multi-robot planning mechanism that combines an optimal task planner and an optimal path planner to provide a scalable solution for complex multi-robot planning problems. The Integrated planner, thro…
Task Planning