Data-driven project planning: An integrated network learning and constraint relaxation approach in favor of scheduling

2023-11-20 · Izack Cohen

Our focus is on projects, i.e., business processes, which are emerging as the economic drivers of our times. Differently from day-to-day operational processes that do not require detailed planning, a project requires planning and resource-constrained scheduling for coordinating resources across sub- or related projects and organizations. A planner in charge of project planning has to select a set of activities to perform, determine their precedence constraints, and schedule them according to temporal project constraints. We suggest a data-driven project planning approach for classes of projects such as infrastructure building and information systems development projects. A project network is first learned from historical records. The discovered network relaxes temporal constraints embedded in individual projects, thus uncovering where planning and scheduling flexibility can be exploited for greater benefit. Then, the network, which contains multiple project plan variations, from which one has to be selected, is enriched by identifying decision rules and frequent paths. The planner can rely on the project network for: 1) decoding a project variation such that it forms a new project plan, and 2) applying resource-constrained project scheduling procedures to determine the project's schedule and resource allocation. Using two real-world project datasets, we show that the suggested approach may provide the planner with significant flexibility (up to a 26% reduction of the critical path of a real project) to adjust the project plan and schedule. We believe that the proposed approach can play an important part in supporting decision making towards automated data-driven project planning.

📄 PDF Abstract BibTeX arXiv:2311.11542

Code (0)

등록된 구현이 없습니다.

Tasks

Decision MakingScheduling

Methods 이 논문이 사용한 방법론

SET Dynamic Sparse Training method where weight mask is updated randomly periodically
Focus 설명 없음

Similar Papers 제목 키워드 기반

Resource-constrained multi-project scheduling with activity and time flexibility

2019-02-25 · Viktoria A. Hauder, Andreas Beham, Sebastian Raggl, Sophie N. Parragh 외

Project scheduling in manufacturing environments often requires flexibility in terms of the selection and the exact length of alternative production activities. Moreover, the simultaneous scheduling of multiple lots is m…

Scheduling

Partitioning Distribution Networks for Integrated Electrification Planning

2024-03-14 · Olamide Oladeji, Pedro Ciller Cutillas, Fernando de Cuadra, Ignacio Perez-Arriaga

In many developing countries, access to electricity remains a significant challenge. Electrification planners in these countries often have to make important decisions on the mode of electrification and the planning of e…

Clustering

DiffSlack: Learning under Nonlinear Inequality Constraints via Learnable Slack Variables

2026-06-03 · Ziqian Wang, Chenxi Fang, Zhen Zhang arxiv

Enforcing nonlinear inequality constraints in neural networks remains challenging, especially when the output is subject to many coupled constraints. Existing hard constraint methods often impose structural restrictions …

Collision Avoidance

Compositional Diffusion-Based Continuous Constraint Solvers

2023-09-02 · Zhutian Yang, Jiayuan Mao, Yilun Du, Jiajun Wu 외

This paper introduces an approach for learning to solve continuous constraint satisfaction problems (CCSP) in robotic reasoning and planning. Previous methods primarily rely on hand-engineering or learning generators for…

Optimal Integrated Task and Path Planning and Its Application to Multi-Robot Pickup and Delivery

2024-03-02 · Aman Aryan, Manan Modi, Indranil Saha, Rupak Majumdar 외

We propose a generic multi-robot planning mechanism that combines an optimal task planner and an optimal path planner to provide a scalable solution for complex multi-robot planning problems. The Integrated planner, thro…

Task Planning