Optimal Planning for Electrical Collector System of Offshore Wind Farm with Double-sided Ring Topology
We propose a planning method for offshore wind farm electrical collector system (OWF-ECS) with double-sided ring topology meeting the "N-1" criterion on cable faults, in which the submarine cables layout of OWF is optimized considering cable length and power losses. The proposed mixed-integer quadratic programming (MIQP) model is based on the Capacitated Vehicle Routing Problem (CVRP) formulation and power network expansion planning, which could approximate the power losses in OWF-ECS. In addition, cross-avoidance constraints are proposed to avoid crossing cables, and the minimum k-degree center tree model is included to improve the convergence. Case studies on OWFs with 30 and 62 WTs demonstrate the effectiveness of the proposed method. Considering the potential outage cost in the radial topology, the total cost of the planning result is reduced by up to 25.9% with reliability improvement. The cable investment is reduced by 4%~8% with the proposed method compared with conventional heuristic methods and Google OR-tools. The proposed method/model can also achieve acceptable computation efficiency and OWF-ECS planning results with good optimality. Moreover, it could be solved by modern commercial solvers/optimization software, thus it's easy to use even for large-scale OWF.
Code (0)
등록된 구현이 없습니다.
Similar Papers 제목 키워드 기반
Large-scale Offshore Wind Farm Electrical Collector System Planning: A Mixed-Integer Linear Programming Approach
In this paper, we propose a planning method for large-scale offshore wind farm (OWF) electrical collector system (ECS) based on mixed integer linear programming, in which the sizing and siting of offshore substations and…
Reliability-Based Planning of Cable Layout for Offshore Wind Farm Electrical Collector System Considering Post-Fault Network Reconfiguration
The electrical collector system (ECS) plays a crucial role in determining the performance of offshore wind farms (OWFs). Existing research has predominantly restricted ECS cable layouts to conventional radial or ring str…
A Smart Switch Configuration and Reliability Assessment Method for Large-Scale Offshore Wind Farm Electrical Collector System
With the development of offshore wind farms (OWFs) in far-offshore and deep-sea areas, each OWF could contain more and more wind turbines and cables, making it imperative to study high-reliability electrical collector sy…
The Low Emission Oil&Gas Open (LEOGO) Reference Platform of an Off-Grid Energy System for Renewable Integration Studies
This article introduces and describes the integrated energy system of a the Low Emission Oil&Gas Open (LEOGO) reference platform. It is a hypothetical case meant to represent a typical oil&gas installation in the North S…
BenchmarkingManagementOptimal Grid Layouts for Hybrid Offshore Assets in the North Sea under Different Market Designs
This work examines the Generation and Transmission Expansion (GATE) planning problem of offshore grids under different market clearing mechanisms: a Home Market Design (HMD), a zonal cleared Offshore Bidding Zone (zOBZ) …